Project Description
Characteristic
- Composed of individual ceiling units
- Every units can be pulled off from the tracks separately with fixed pulling angle
- It is suitable for ceilings which need frequent maintainance of facilities, especially useful for mass transport system.
- stable ceiling system
- Easy to be installed and demounted.
- Maintenance work is convenient.
- Air Hole >>
- Absorption >>
Model No | Size |
---|---|
/ | / |
Model No | Component | ||
---|---|---|---|
1 | M-01 | Main Runner | 主龍骨 |
2 | M-02 | Main Runner Connector | 主龍骨駁碼 |
3 | M-03 | Outer C-angle Frame | 外框C槽 |
4 | M-04 | Inner C-angle Frame | 內框C槽 |
5 | M-05 | Panel Holder Channel | 鎖勾U槽 |
6 | M-06 | Panel Holder Rod | 鎖勾圓枝 |
7 | M-07 | Panel Holder Bracket | 鎖勾碼 |
8 | M-08 | Panel Holder | 鎖勾 |
9 | M-09 | Triangle Plate | 定位角片 |
10 | M-10 | Recentangle Plate | 定位中片 |
11 | M-11 | Security Lock | 安全扣 |
12 | M-12 | Outer C-angle Bracket | 外框旁碼 |
13 | M-13 | Main Line Support | 線橕 |
14 | M-14 | Cross Line Support | 旁橕 |
15 | M-15 | Baffle Ceiling Panel | 天花 |
16 | M-16 | End Cap | 封頭蓋 |
17 | M-17 | Screw Rod | 螺絲杆 |
18 | M-18 | Positioned Angle | 加固鐵碼 |
19 | M-19 | Perforated L-angle | 有孔角鐵 |
Demonstration